Scope of Work
Site Improvements ($2,229,666)
- Stadium Improvements and Turf Replacement
- Turf Field Drainage Improvements
- Access Road Repaving to Sulphur Springs
- Resurfacing of Track and Associated Areas
- Middle School Tennis Courts Surfacing Repairs
- Middle School Accessible Ramp to Softball Fields Area Bleachers
Roof Replacements ($2,653,410)
- High School (11,000 SF)
- Middle School (Entire Roof: 42,500 SF)
- Elementary School (2,003 SF)
- Bus Garage (Entire Roof - Except Area Above Offices: 15,100 SF)
Flooring ($1,539,900)
High School
-
- Replace rubber tile at vestibule
- Classroom kitchen flooring replacement
Middle School
-
- Replace existing floor with new resilient tiles (Selected Rooms)
- Replace existing corridors, vestibules, lobbies and staircase floors with new epoxy terrazzo.
Elementary School
-
- Replace corridor floor tile
- Refinish gym wood floors
- Replace existing floor with new resilient tiles (Selected Rooms)
Mechanical Upgrades ($1,728,950)
High School
-
- Ventilation upgrades throughout building
- Ventilation upgrades throughout building
Middle School
-
- Gymnasium ventilation upgrades
- Gymnasium ventilation upgrades
Elementary School
-
- Ventilation upgrades throughout building
- Ventilation upgrades throughout building
Bus Garage
-
- Heating and ventilation upgrades
- Heating and ventilation upgrades
Other Key Upgrades
High School
-
- Boys and Girls Locker Room: Minor renovations for gender neutral changing areas
- Exterior Brick Masonry Repointing / Repairs / Replacements
- Upgrade elevators and controls
- Plumbing Replacements
Middle School
-
- Boys and Girls Locker Room: Minor renovations for gender neutral changing areas
- Exterior Brick Masonry and Chimney Repointing
- Plumbing Replacements
Elementary School
-
- Exterior Brick Masonry Repointing / Repairs / Replacements
- Plumbing Replacement