Scope of Work

  • Site Improvements ($2,229,666)

    • Stadium Improvements and Turf Replacement
    • Turf Field Drainage Improvements
    • Access Road Repaving to Sulphur Springs
    • Resurfacing of Track and Associated Areas
    • Middle School Tennis Courts Surfacing Repairs
    • Middle School Accessible Ramp to Softball Fields Area Bleachers

    Roof Replacements ($2,653,410)

    • High School (11,000 SF)
    • Middle School (Entire Roof: 42,500 SF)
    • Elementary School (2,003 SF)
    • Bus Garage (Entire Roof - Except Area Above Offices: 15,100 SF)

    Flooring ($1,539,900)


    High School

      • Replace rubber tile at vestibule
      • Classroom kitchen flooring replacement


    Middle School

      • Replace existing floor with new resilient tiles (Selected Rooms)
      • Replace existing corridors, vestibules, lobbies and staircase floors with new epoxy terrazzo.


    Elementary School

      • Replace corridor floor tile
      • Refinish gym wood floors
      • Replace existing floor with new resilient tiles (Selected Rooms)




    Mechanical Upgrades ($1,728,950)


    High School

      • Ventilation upgrades throughout building

    Middle School

      • Gymnasium ventilation upgrades

    Elementary School

      • Ventilation upgrades throughout building

    Bus Garage

      • Heating and ventilation upgrades

    Other Key Upgrades


    High School

      • Boys and Girls Locker Room: Minor renovations for gender neutral changing areas
      • Exterior Brick Masonry Repointing / Repairs / Replacements
      • Upgrade elevators and controls
      • Plumbing Replacements

    Middle School

      • Boys and Girls Locker Room: Minor renovations for gender neutral changing areas
      • Exterior Brick Masonry and Chimney Repointing
      • Plumbing Replacements

    Elementary School

      • Exterior Brick Masonry Repointing / Repairs / Replacements
      • Plumbing Replacement